Installation

The installation phase starts once  the project design and customer project evaluation stages have been completed. The dynamics of the installation process depends on the complexity of the system, as well as specific customer requirements.

Installation itself is divided into several steps:

  1. Supply of equipment
  • Equipment is from reputable manufacturers
  • Equipment is the latest generation
  • Equipment is mutually compatible
  • Cables come with protection against rodents and aggressive chemicals
  • Active equipment is adapted to the environment and to users
  1. Equipment installation
  • Performed according to Telcordia and Bellcore standards
  • The advanced tools and devices are used for connection and measurement
  • Complete modules are simultaneously installed
  • Easy future system expansions are enabled
  1. Test run and control
  • Performed in coordination with the user
  • At sufficiently long period (30-60 days)
  • Fine-tuning of the system
  • Constant system improvements